Rietveld Princess Rahma College Jordan Officially Opened

Rietveld Princess Rahma College Jordan Officially Opened

The aerated reed bed that Rietland installed in Jordan in collaboration with UFZ Leipzig was officially opened on Wednesday, March 26, 2014. Among those present were the German Ambassador to Jordan and the Jordanian State Secretary of the Ministry of Water and Irrigation.

In collaboration with UFZ Leipzig, two aerated reed beds were constructed in Jordan. The first system for an extensive family home and the second for the Princess Rahma University. Both projects are located near the Jordanian capital, Amman.



The constructed wetland at Abu Rumman (the owner) has a capacity of 35 PE.

In Jordan, whole families often live in one house, including grandparents, aunts and uncles, and children. That's why a reed bed for one family is much larger there than is common here.

As can be seen in the photo, the aerated reed bed is situated in the middle of an olive grove. A beautiful setting!



The reed bed at the Princess Rahma College is much larger. It has a capacity of 400 PE and consists of two sub-fields of 200 PE each.

One of the aspects during construction is testing the aeration, which often creates beautiful bubble patterns (see photo).

The construction of both systems was completed in February 2014. Rietland designed and installed the aeration, and manager Dion van Oirschot went on site to install and test it.

In the coming years, the reed beds will be scientifically monitored by UFZ Leipzig.

blogs

In the spotlight

In our blogs, we share insights, developments, and practical knowledge about water treatment and circular water use.

contact

How can we help you?

Do you have questions about any of our products or services? Feel free to contact us!